- Intro
- Why We Need Shoring
- Understand the Construction Early Work Sequence
- Section 1 Power Point
Construction Management Part II - Construction Early Works
Quick Facts
particular | details | |||
---|---|---|---|---|
Medium of instructions
English
|
Mode of learning
Self study
|
Mode of Delivery
Video and Text Based
|
Course and certificate fees
Fees information
₹ 499 ₹799
certificate availability
Yes
certificate providing authority
Udemy
The syllabus
Introduction
All About Shoring
- Required Reports Before Shoring Selection
- Walk Through Dial Before You Dig
- Geotechnical Report Introduction
- Typical Geotechnical Report
- Shoring Design Report
- Section 2 Slides
Shoring System Types
- Shoring System Types
- Benching and Concrete Retaining
- Soldier Pile
- Secant Pile
- Sheet Pile
- Diaphragm Wall
- Other Shoring
- Section 3 Slides
Anchoring Types and Technicalities
- Anchoring Types and Technicalities
- Soil Nail
- Rock Bolt
- Strand Anchor
- Quiz
- Quiz Answer
- Waler System
- Shortcrete
- Section 4 Slides
Introduction to Dewatering
- Introduction to dewatering
- DMP Assessment and Problem
- Dewater Method - Exclusion
- Dewater Method - Sump Pump
- Dewater Method - Well Point, Deep Well, Eductor Well
- Dewater Technicalities and Impact
- Section 5 Slides
Articles
Popular Articles
prev
next