Careers360 Logo
EPC Full Form

EPC Full Form

Edited By Team Careers360 | Updated on Jan 11, 2023 03:59 PM IST

What is the full form of EPC

The full form of EPC is Engineering, Procurement and Construction. EPC is a prominent type of contract in the building industry. This section defines the contractor-client relationship. It contains all of the information regarding the construction project, including the project design, material procurement, and the labour and equipment required for completion. It also includes the construction process's time constraints and the cash payable to the contractor.

EPC Contracts

These projects typically begin with a design engineering plan, are followed by the acquisition of construction supplies, and conclude with the project's construction. These duties are carried out by EPC contractors, who have specific understanding in the field. The client enters into a contract with the EPC contractors, making the EPC contractors responsible for providing a working asset to their client.

Features of EPC

The following issues are covered by EPC contracts:

Engineering functions

Procurement functions

Construction functions

Construction functions

  • Engineering fundamentals

  • Detailed engineering

  • Construction Engineering Planning

  • Logistics and transport

  • Receiving

  • Procurement

  • Invoicing

  • Purchasing


  • Electrical installation

  • Mechanical erection

  • Civil engineering


  • After-sales-service

  • Testing and commissioning

  • Modernization of plants


Fundamentals of EPC

The criteria for determining the degree of agreement

  • The agreement should be written with the business at the top of the priority list in mind.

  • The motivation behind the arrangement should not be ambiguous.

  • The agreement's level should be meticulously prepared, with all peculiarities and courses of affairs for all key exercises to be completed by the gatherings incorporated.

  • If there are two or more workers for hire chipping away at the project, the reach lattice should reflect the division of extension, with unambiguous exercises in terms of sums and no hybrids or holes. The take-off points and scope constraints should always be referred to.

  • The agreement's extension should not be overly complex or specialised.

EPC Projects That Worked

  • Mt. Milligan Copper-Gold Project

  • Diavik Diamond Project

  • Solar Power Project: A solar power plant was constructed on the roof of a hospital in Indore, Madhya Pradesh.

Major EPC Companies Throughout India

With its growing prominence and shifting dynamics, the Indian EPC sector now has over 180 participants and a plethora of stakeholders. Based on their industry focus, players have carved out a place for themselves and built a reputation. Some have even divested their businesses in other industries, thereby segmenting the whole EPC field.

  • Tata Projects Ltd

  • BGR Energy

  • Gammon Indian

  • Gayatri Projects

  • Mcnally Bharat Engineering

  • Shriram EPC Ltd

  • Tecpro systems

Other Related Full Forms -


Frequently Asked Questions (FAQs)

1. Why is an EPC contract important?

The structure of EPC Contracts enables the project owner to manage risk more effectively and allows contractors to allocate and specialise in the tasks they conduct. Common EPC Contracts give the contractor complete authority over the project's design, procurement, and construction from start to finish.

2. What exactly is EPC in the context of quality control?

EPC (Engineering, Procurement, and Construction) is a project delivery methodology based on contracts. It's a common phrase for a specific type of project execution and contract design.

3. What is the risk of EPC?

There are two categories of risks to handle when dealing with risks for construction companies: corporate risks and project implementation risks. Time catastrophe, commercial disaster, quality disaster, and health, safety, and/or environmental hazards are the primary crisis scenarios for an EPC contractor.

4. What exactly is the EPC problem?

The Electronic Power Control (EPC) warning light shows that there is an issue with your vehicle's throttle system, which may include the accelerator pedal, fuel injection throttle body, traction control, cruise control, or other components.

5. What is the EPC delivery system?

This project delivery method allows the owner to be hands-off and does not necessitate a large internal project management staff.

6. Who is in charge of EPC?

The individual in charge of having the construction work done must provide an EPC to the building's owner (i.e. the builder). Building Control must receive a copy of the EPC within five days of the work being completed.

Back to top