In 6 days, A and B both complete a work.
In 1 day, they both do 1/6 work.
In 9 days A does a work.
In 1 day, A does 1/9 work.
Therefore, in one day B does (1/6-1/9) work, i.e. 1/18 work.
Thus, B will take 36 days to complete the same work.