Question : Direction: The following bar graph shows the production of table fans in a factory for one week. Study the bar graph and answer the given question.
The average production of table fans on Monday and Tuesday exceeds the average of table fans during the week by:
Option 1: 150 fans
Option 2: 100 fans
Option 3: 140 fans
Option 4: 200 fans
Latest: SSC CGL preparation tips to crack the exam
Don't Miss: SSC CGL complete guide
Correct Answer: 100 fans
Solution :
According to the provided bar graph,
Total number of table fans produced on Monday and Tuesday $= 260 + 540 = 800$
Number of days $= 2$
Average production of table fans on Monday and Tuesday $= \frac{\text{Total productivity on Monday and Tuesday}}{\text{Number of days}}=\frac{800}{2}=400$
Total production of table fans in the week $= 260+540+360+120+200+320 = 1800$
Required average production of table fans in the week $= \frac{1800}{6}=300$
The weekly average production is 300.
Required difference = Average production on Monday and Tuesday – Weekly average production $= 400 - 300 = 100$ fans
Hence, the correct answer is 100 fans.
Related Questions
Know More about
Staff Selection Commission Combined Grad ...
Answer Key | Eligibility | Application | Selection Process | Preparation Tips | Result | Admit Card
Get Updates BrochureYour Staff Selection Commission Combined Graduate Level Exam brochure has been successfully mailed to your registered email id “”.