In PERT, which three kinds of estimates are utilized?
In PERT, there are three estimation times; Optimistic Time Estimate (TOPT), Most Likely Time Estimate (TLIKELY), and Pessimism Time Estimate (TPESS). In PERT, these three estimated times are determined for every action.