Question : The first bullet train project in India aims to run a bullet train at 320 mph along a high-speed rail (HSR) track between _______.
Option 1: Jaipur and Mumbai
Option 2: Ahmedabad and Mumbai
Option 3: Delhi and Hyderabad
Option 4: Kolkata and Chennai
Latest: SSC CGL preparation tips to crack the exam
Don't Miss: SSC CGL complete guide
New: Unlock 10% OFF on PTE Academic. Use Code: 'C360SPL10'
Correct Answer: Ahmedabad and Mumbai
Solution : The correct answer is Ahmedabad and Mumbai .
The Mumbai-Ahmedabad High-Speed Rail (MAHSR) is the official name of the first bullet train project in India. The project's goal is to run a bullet train between Ahmedabad and Mumbai at 320 km/h on a high-speed rail (HSR) track, which is roughly 508 km in length.
Candidates can download this ebook to know all about SSC CGL.
Answer Key | Eligibility | Application | Selection Process | Preparation Tips | Result | Admit Card
Question : India's first high-speed rail line is being constructed between (as of February 2022):
Question : A train of length 100 metres crosses another train of length 150 metres, running on a parallel track in the opposite direction, in 9 seconds. If the speed of a train having a length of 150 metres is 40 km/h, then what is the speed (in km/h) of the other train?
Question : Train A takes 45 minutes longer than Train B to travel a distance of 450 km. Due to engine trouble, the speed of train B falls by a quarter, so it takes 30 minutes more than train A to complete the same journey. What is the speed of train A (in km/h)?
Question : Which two of the following are connected by the North South corridor ?
Question : A train covers the distance between station A and station B in 45 minutes. If the speed of the train is reduced by 5 km/hr, then the same distance is covered in 48 minutes. The distance between stations A and B is:
Regular exam updates, QnA, Predictors, College Applications & E-books now on your Mobile