Question : The Ghatampur thermal power plant, approved by Cabinet, is to be set up in__________.
Option 1: Rajasthan
Option 2: Uttar Pradesh
Option 3: Karnataka
Option 4: Madhya Pradesh
Latest: SSC CGL Tier 1 Result 2024 Out | SSC CGL preparation tips to crack the exam
Don't Miss: SSC CGL Tier 1 Scorecard 2024 Released | SSC CGL complete guide
Suggested: Month-wise Current Affairs | Upcoming Government Exams
Correct Answer: Uttar Pradesh
Solution : The correct answer is Uttar Pradesh .
The Ghatampur thermal power station of Neyveli Lignite Corporation (NLC) is a joint venture between NLC and the Uttar Pradesh government. It will be built in Ghatampur district in Kanpur, Uttar Pradesh, and run on coal. The project would provide 1478.28 MW of energy to Uttar Pradesh and 492.72 MW of energy to Assam.
Candidates can download this ebook to know all about SSC CGL.
Admit Card | Eligibility | Application | Selection Process | Preparation Tips | Result | Answer Key
Question : Which of the following sources has the largest share in power generation in India?
Question : Which kind of power accounts for the largest share of power generation in India ?
Question : India exports power to ----
Question : Ethanol containing 5% water is known as
Question : Which of the following produces the most solid waste ?
Regular exam updates, QnA, Predictors, College Applications & E-books now on your Mobile